![]() ![]() The insurance shall be in full force and effect before any work is done on the Railway Right of Way and shall remain in full force and effect and not be can- celled by the Contractor until all work required to be done on the Railway Right of Way has been completed, as evidenced by acceptance of the portion of the work by the Department.F. The policies shall be in a form and substance satisfactory to the Railroad.3. 61 Plan shewing land required for Railway Right of Way 1884” and was deposited in the provincial land registry on July 14, 1885, on behalf of the Minister of Railways and Canals.Īt least 10 days before any work is done on the Railway Right of Way, the Contractor shall procure and furnish to the Department’s Construction Engi- neer (Construction Division, North Dakota Department of Transportation, 608 East Boulevard, Bismarck, ND 58505-0700), the insurance policy or a certified copy of the Railway Protection Insurance Policy. In response to paragraph 25, Canada says that the location plan, Plan 33117, is entitled “CPR Contract No. ![]() Examples of Railway Right of Way in a sentence
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |